₹608 crore residential project gets fresh environmental clearance in Telangana

This document grants prior Environmental Clearance for the construction of a residential apartment project by M/s.

Anahita Developers LLP. The project is located in Mallampet Village, Medchal-Malkajgiri District, Telangana, and involves the construction of five residential blocks and amenities to accommodate 953 units.

Who it concerns: The project proponent is M/s. Anahita Developers LLP. The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Telangana, following a recommendation by the State Level Expert Appraisal Committee (SEAC).

Conditions and facts

  • Clearance Status: Fresh Environmental Clearance (Category B1) granted on 18/06/2026.
  • Project Cost: Rs. 608 Crores.
  • Site Area: 30,416.6 Sq.m; Total built-up area: 2,45,653.0 Sq.m.
  • Capacity: 953 residential units across five blocks (3B + G + 21 Upper Floors each).
  • Parking: 77,740.3 Sq.m provided (46.29% of site area).
  • Greenbelt: 3,082.9 Sq.m (10.1% of site area) to be provided.
  • Water: Total requirement 837 KLD (538.4 KLD fresh from HMWSSB, 298.6 KLD recycled).
  • Waste Treatment: STP capacity of 830 KLD; treated water to be used for flushing and greenery.
  • Conditions: Proponent must obtain all other statutory clearances (town planning, pollution consent, etc.), advertise the clearance in two local newspapers within seven days, and implement an Environmental Management Plan (EMP) with specific budget allocations for environmental protection.

Also in the document

  • The document states that the project proponent must obtain forest clearance under the Forest (Conservation) Act, 1980, in case of diversion of forest land, implying potential forest land involvement, though specific forest area details are not quantified in the provided text.
  • The project includes a significant environmental protection budget: Rs. 857.1 lakhs for capital cost during construction and Rs. 285.8 lakhs annually during the occupation phase.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/TG/INFRA2/579023/2026 · 16 May 2026

Clearance 16 May 2026 · 0.3 MB Open the document On parivesh.nic.in ↗