Amendment to EC for Muppa’s Swarnaprastha project approved on 18/06/2026

This document grants an amendment to the Environmental Clearance (EC) for the construction of 217 residential villas titled “Muppa’s Swarnaprastha” in Sangareddy district, Telangana.

10 kmThe site is located within the 10 km radius of Himayatsagar and Osmansagar Lakes, but the specific village is not l…

The project involves a reduction in the total site area, number of villas, and built-up area compared to the original clearance.

Who it concerns: The project proponent is Muppa Constructions India Private Limited. The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Telangana.

Conditions and facts

  • Clearance Status: Amendment to EC dated 13/01/2026 approved on 18/06/2026.
  • Location: Velimela Village and Patighanpur Village, Tellapur Municipality, Sangareddy District, Telangana.
  • Scale: Total site area reduced to 113,740.94 sq. m; number of villas reduced from 229 to 217; total built-up area reduced to 1,00,020.84 sq. m.
  • Infrastructure: Power load reduced to 1953 KVA; STP capacity set at 180 KLD; project cost revised to 231 Crores.
  • Conditions: Proponent must provide a 2m greenbelt along boundaries, install EV charging points, and ensure sewage treatment and reuse for gardening.
  • Conditions: Proponent must strengthen walls adjacent to the nala buffer (9-12 inches thick, 7 feet high) to prevent flooding.
  • Conditions: Proponent must obtain environmental safeguards from SPCB/PCC within 30 days and upload self-certification reports to the PARIVESH portal twice yearly.

Also in the document

  • The site is located within the 10 km radius of Himayatsagar and Osmansagar Lakes, but the specific village is not listed in the restricted catchment area list per G.O.Ms.No. 111 M.A dt. 08.03.1996.
  • A portion of the land (Ac. 00-25 Gts) is affected by a nala (4m) and buffer (2m), requiring specific structural safeguards against flooding.
  • The amendment reduces the project footprint and environmental load (water, sewage, waste) compared to the original clearance.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/TG/INFRA2/578940/2026 · 18 May 2026

Clearance 18 May 2026 · 0.3 MB Open the document On parivesh.nic.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.