Environmental clearance corrigendum allows increased built-up area for Mumbai residential project
This document grants a corrigendum (correction) to the Environmental Clearance for a residential building project in Borivali (West), Mumbai, Maharashtra. It corrects errors in the building height, floor configuration, and Floor Space Index (FSI) figures previously approved.
The project proponent is M/s. Yash Developments. The clearance was granted by the Ministry of Environment, Forest and Climate Change (MoEF&CC), with the letter issued by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.
- Status: Corrigendum to Amendment in Environmental Clearance granted.
- Correction 1: Building height corrected from 127.97 meters to 127.79 meters; configuration corrected to 2 Basement + Stilt/Ground + 3 Podium + 33 Upper floors.
- Correction 2: FSI increased from 33,864.12 m² to 34,044.24 m²; Non-FSI increased from 23,432.38 m² to 26,500.38 m²; Total Built-Up Area (BUA) increased from 57,296.50 m² to 60,545.10 m².
- Condition: Compliance with terms and conditions stipulated in the original clearance letter is required.
- Note: The document references MoEF&CC notifications exempting certain projects from separate Consent to Establish (CTE) under Water and Air Acts, noting MPCB comments were submitted.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Expansion in Environment Clearance of Proposed Residential Project at C.T.S. no. 15/F, 15/G & 15/I (15/F/1, 15/F/2, 15/F/3, 15/G/1, 15/G/2, 15/G/3, 15/I/1, 15/I/2) of Village Kandivali, Bhatt Lane, Poisar, Borivali (W), Mumbai, R/C ward by M/s. Yash Developments |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | SIA/MH/INFRA2/576154/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |