This document grants a corrigendum (correction) to the Environmental Clearance for a residential building project in Borivali (West), Mumbai, Maharashtra.
It corrects errors in the building height, floor configuration, and Floor Space Index (FSI) figures previously approved.
Who it concerns: The project proponent is M/s. Yash Developments. The clearance was granted by the Ministry of Environment, Forest and Climate Change (MoEF&CC), with the letter issued by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.
Conditions and facts
- Status: Corrigendum to Amendment in Environmental Clearance granted.
- Correction 1: Building height corrected from 127.97 meters to 127.79 meters; configuration corrected to 2 Basement + Stilt/Ground + 3 Podium + 33 Upper floors.
- Correction 2: FSI increased from 33,864.12 m² to 34,044.24 m²; Non-FSI increased from 23,432.38 m² to 26,500.38 m²; Total Built-Up Area (BUA) increased from 57,296.50 m² to 60,545.10 m².
- Condition: Compliance with terms and conditions stipulated in the original clearance letter is required.
- Note: The document references MoEF&CC notifications exempting certain projects from separate Consent to Establish (CTE) under Water and Air Acts, noting MPCB comments were submitted.
Also in the document
- The document explicitly states that the previous clearance contained a typographical error regarding building height and floor configuration.
- The corrigendum allows for an increase in the total Built-Up Area (BUA) by approximately 3,248.60 m² compared to the previously restricted limit.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
⚠ Figures not confirmed. Our automated check could not find every number in this summary in the document. Treat the figures with care and check the original.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
This document is in our archive but is not shown on our front pages: a number in the summary could not be found in the document.
The original document
PARIVESH — Environmental & Forest Clearances (MoEFCC)
Clearance · Ref. SIA/MH/INFRA2/576154/2026 · 27 May 2026
Read it here