Fresh environmental clearance granted for 4.17 hectare Pune project, no forest land involved
This is a prior Environmental Clearance for a residential and commercial project (township/area development) located in Village Vadgaon Bk., Taluka Haveli, District Pune, Maharashtra. The project involves the development of 4.17 hectares of non-forest land with a total built-up area of 18.1855 hectares.
The project proponent is M/s. Kalpataru Ltd. (represented by Suresh Mehta). The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.
- Clearance Status: Fresh Environmental Clearance (Category B1) granted on 20/07/2026.
- Land Area: 4.17 hectares of Non-Forest Land; 0 hectares of Forest Land.
- Project Cost: 52,190 lakhs; EMP Cost: 925.5 lakhs.
- Condition: Obtain planning approvals and ensure Green Open Space (RG area) as per Supreme Court orders.
- Condition: Increase fruit-bearing trees in the plantation plan.
- Condition: Implement a plan to make the project a plastic-free zone.
- Condition: Treat sewage to meet National Green Tribunal standards (30.04.2019 order) and ensure construction water is not drinking water.
- Condition: Manage construction and demolition waste as per 2016 Rules.
- Condition: Provide electric vehicle charging points as per Maharashtra EV Policy 2025.
- Condition: Achieve minimum 5% energy saving using non-conventional energy sources.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Clearance
2026-05-27
Tap “Open the PDF” above to view this document.
Document details
| Official title | Environment Clearance for Proposed Residential & Commercial Project at S.No.31/32B/1/2/3A/3B/4/5/ PLOT-B, Village-Vadgaon Bk., Taluka-Haveli, District-Pune. By M/s. Kalpataru Ltd. |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | SIA/MH/INFRA2/580330/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |