Dikchu Hydroelectric Power Project
Plain-language summary (AI-generated) — a quick read so you don't have to open the full PDF. May contain errors; the original document below is authoritative.
What is this clearance for?
The Dikchu Hydroelectric Power Project (96 MW) is being expanded to 110 MW in Gangtok and Mangan districts of Sikkim, involving a hydroelectric power plant.
Who it concerns
M/s Sneha Kinetic Power Projects Private Limited (erstwhile Greenko Energies Private Limited) and the Ministry of Environment, Forest and Climate Change (MoEF&CC)
Key facts & conditions
- Clearance Type: Fresh EC
- Category A
- Area: Not specified
- Capacity: 96 MW to 110 MW
- Conditions: Study after 5 years, dedicated environmental team, in-house lab, construction material permissions, socio-economic measures including solar panels, schools, hospitals, skill development, bio-gas plants, and preference for project-affected families in employment
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | IA/SK/RIV/580316/2026 |
| Status | closed (section: clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Clearance
2026-06-01
IA-SK-RIV-580316-2026.pdf
Tap “Open the PDF” above to view this document.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →