कौन ज़िम्मेदार? KaunZimmedar
BrowsePARIVESH › clearance

Amelia Coal Mine Project

PARIVESH closed 2026
Plain-language summary (AI-generated) — a quick read so you don't have to open the full PDF. May contain errors; the original document below is authoritative.

What is this clearance for?

The Amelia Coal Mine Project, located in Singrauli district, Madhya Pradesh, involves mining coal with a production capacity of 5.6 MTPA over an area of 1180.2 hectares.

Who it concerns

M/s THDC India Limited (project proponent) and Ministry of Environment, Forest and Climate Change (granting authority)

Key facts & conditions

  • Amendment in Environmental Clearance
  • Area: 1180.2 ha
  • Capacity: 5.6 MTPA
  • Conditions: Railway siding to be developed by June 2026; coal transportation through covered trucks until railway siding operational; silo loading system to be operational by March 2027
Source bodyPARIVESH — Environmental & Forest Clearances (MoEFCC)
Reference numberIA/MP/CMIN/580594/2026
Statusclosed (section: clearance)
Year2026
Closing date
Documents1

Highlights & Points worth asking

Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.

No automated observations for this document. Read the documents below directly.

Documents

The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.

Clearance 2026-06-04 IA-MP-CMIN-580594-2026.pdf
Tap “Open the PDF” above to view this document.

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →