SEIAA grants environmental clearance for 40,477.36 Sqm Ranchi mall project
This document grants Environmental Clearance (EC) for the construction of a commercial and residential building project named 'Essence Mall' (previously Eminence Mall) in Ranchi, Jharkhand.
The project proponent is Morias Infrastructure Private Limited (represented by Sumit Singh), and the clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Jharkhand.
- Clearance Status: Granted by SEIAA Jharkhand on 11/07/2026.
- Project Category: B2 (Building/Construction).
- Location: Mauza Chadri, Plot Nos. 1824, Khata No. 57, Ranchi, Jharkhand.
- Size: Total built-up area of 40,477.36 Sqm (Existing: 28,467.87 Sqm, Proposed: 12,009.49 Sqm).
- Conditions: Must obtain town planning clearance, structural safety approval (earthquake/fire/lightning), forest clearance if applicable, National Board for Wildlife clearance if applicable, and Pollution Control Board consents (Air/Water).
- Note: The document states 'Applicability of General Conditions: no' and 'Applicability of Specific Conditions: no' in the summary table, but Annexure 1 lists standard statutory compliance conditions.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Clearance
2026-06-06
Tap “Open the PDF” above to view this document.
Document details
| Official title | Proposed Commercial cum Residential Building Project “Essence Mall (Previously Eminence Mall) of Morias Infrastructure Pvt. Ltd. |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | SIA/JH/INFRA2/576415/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |