Environmental clearance granted for Pune township project with tree replacement condition
This document grants prior Environmental Clearance for the new construction project 'Rohan Abhilasha 5', a township/area development project located in Wagholi, Haveli Taluka, Pune district, Maharashtra.
The project proponent is M/s. Rohan Builders and Developers Pvt. Ltd. (represented by Milind Lunkad), and the clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.
- Clearance Status: Fresh Environmental Clearance (Category B1) granted on 28/07/2026.
- Land Area: 12.734 hectares of Non-Forest Land (0 hectares of Forest Land).
- Project Cost: 101,000 lakhs (approx. 1,010 Crores INR).
- Condition: Replace Saptaparni, Parijatak, and Sonchafa trees with other indigenous species in the plantation plan.
- Condition: Implement a plan to make the project a plastic-free zone.
- Condition: Ensure treated sewage meets National Green Tribunal standards (order dated 30.04.2019) and do not use drinking water for construction.
- Condition: Provide electric vehicle charging facilities as per the Maharashtra Electric Vehicle Policy, 2025.
- Condition: Achieve minimum 5% energy saving using non-conventional energy sources.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Clearance
2026-06-12
Tap “Open the PDF” above to view this document.
Document details
| Official title | New Construction Project “Rohan Abhilasha 5” at Wagholi Haveli Pune by Rohan Builders and Developers Pvt. Ltd. |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | SIA/MH/INFRA2/568881/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |