What did the audit examine?
The audit examined the implementation of the Jal Jeevan Mission (JJM) in Madhya Pradesh from 2019-20 to 2023-24, focusing on planning, execution, monitoring, and outcomes of the scheme.
Who / what it concerns
Government of Madhya Pradesh (specifically the Public Health Engineering Department and MP Jal Nigam)
What the auditor found
- Systemic planning deficiencies including absent or delayed baseline surveys leading to inaccurate assessments and cost escalations
- Community engagement was superficial with near-zero financial participation (community contributions)
- Only 27% of Multi-Village Schemes and 58% of Single-Village Schemes completed as of September 2024
- Flawed estimations causing cost escalations, avoidable expenditures, inflated tenders, and richer specifications
- Non-issuance of physical completion certificates in SVSs with 7 of 28 inspected sites found non-functional
- Liquidated damages not recovered from contractors
- Only 0.38% of funds earmarked for water quality monitoring were spent, with 1.62% diverted for construction
- Water quality testing conducted at only 58-99% (district labs), 22-48% (State Lab), and 11-19% (Jal Nigam WTP) of prescribed frequency
- 11,94,063 private/own source tap connections incorrectly included in JJM FHTCs in the portal
Points worth noting
- Only 60.90 lakh rural households covered by December 2024 out of a target of 1.12 crore FHTCs
- 13.53 lakh households already had tap connections before JJM began
- Madhya Pradesh lagged with 69% coverage vs national 80%
- Only 18 of 33 fluoride-affected villages in Dindori District had Electrolytic Defluorination Units by December 2021
- 11,94,063 private/own source tap connections incorrectly counted as JJM FHTCs
- Water quality monitoring funds: only 0.38% spent, 1.62% diverted for construction
- Only 11-19% of prescribed water quality tests conducted at Jal Nigam WTP labs
| Source body | Comptroller & Auditor General of India (CAG) — audit reports |
| Reference number | Report No. 4 of 2026 |
| Status | closed (section: audit_report) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Audit_report
2026
125578-Report-No-4-of-2026-Report-of-the-Comptroller-and-Auditor-General-of-I.pdf
Tap “Open the PDF” above to view this document.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →