Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Corrections

Report an error

Tell us what is wrong. The original document is the authority, so the most useful report says what the document says and what we got wrong.

Story: Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design chainage Km 0+000) and ending at existing Km 108+750 of NH217 (Design chainage Km 29+030) (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya.



We do not ask who you are. We store a scrambled code instead of your internet address, only to stop the form being flooded.