Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Corrections

Report an error

Tell us what is wrong. The original document is the authority, so the most useful report says what the document says and what we got wrong.

Story: Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH129A from Design Km 173.850 to Km 190.850 (Length – 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP



We do not ask who you are. We store a scrambled code instead of your internet address, only to stop the form being flooded.