Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Corrections

Report an error

Tell us what is wrong. The original document is the authority, so the most useful report says what the document says and what we got wrong.

Story: Widening & Upgradation to 2-lane with paved shoulder of Balance Work of NH-301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode, including the Additional Protection Works for Widening & Upgradation to 2-lane with paved shoulder of NH-301 Kargil Zanskar Road from Design km 30.040 to km 57+000 of 26.960 Km length in the Union Territory of Ladakh on EPC mode.



We do not ask who you are. We store a scrambled code instead of your internet address, only to stop the form being flooded.