Sunday, 8 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Corrections

Report an error

Tell us what is wrong. The original document is the authority, so the most useful report says what the document says and what we got wrong.

Story: Construction Four laning of N. Kawnpui (N. Mualvum) –Mualkhang via Khamrang Village section (Package-7) of NH-6 from Existing Chainage km 127+200 to km 142+000 (Design Chainage km 111+850 to km 123+400) on Silchar – Vairengte – Sairang road in the State of Mizoram on EPC mode & Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Mizoram on EPC mode



We do not ask who you are. We store a scrambled code instead of your internet address, only to stop the form being flooded.